Eccentricity
The conductor sitting off-centre inside the insulation, so one side of the wall is thin. A dielectric weak spot and a spark-test risk.
A glossary of the defects and process terms Draweon's agents work with, the standards the reasoning layer cites, and the inputs a plant brings to a pilot baseline. No white papers or calculators are published yet; this page is the reference we actually have.
Retrieval is tenant-isolated and every answer carries its citation.
The defects and process terms that appear throughout the site.
The conductor sitting off-centre inside the insulation, so one side of the wall is thin. A dielectric weak spot and a spark-test risk.
How centred the conductor is in the wall, usually the ratio of minimum to maximum wall. Extrio holds it; Eddix measures and predicts it.
A local thinning of the insulation or the conductor. On extrusion it follows a melt-pressure or speed step; on drawing it precedes a break.
A local thickening of the insulation, often from contamination or a melt surge. Caught by laser gauge and cameras.
A breakdown of the insulation under the spark tester's voltage. The fault exists before the tester finds it, which is what Eddix predicts.
A tiny void or hole through the insulation. A field-escape risk that rarely shows in a diameter trace.
Strands separating and bulging out of a stranded conductor, from tension or lay faults. Cablyn predicts and prevents it.
The distance along the conductor for one full twist of a strand. It decides flexibility, diameter and electrical behaviour.
Polymer or copper used beyond nominal to stay safely above the minimum. Money the plant pays for margin it could hold with better control.
The gradual opening of a drawing die. It changes diameter and tension and raises break risk until the die is changed.
The record of a reel: conductor lot, draw and anneal record, lay, wall trace, defect map, approvals and release decision.
The pace the line must hold to meet the order plan. Yield-and-Takt balances it against downstream capacity and energy.
The inputs for a baseline agreed in writing.
The pages that explain the mechanics.
How the plant-edge runtime, orchestrator, agents, twin and cloud loop fit together.
The write path, the audit record and the data governance.
What a pilot on extrusion, drawing or inspection would do and measure.
Why the line still runs on feel, autonomy as a dial, hit spec before the first metre.
The SDK and CLI design previews.
Tiers, the comparison table and the arithmetic a plant runs.
Every Draweon run is an ordered, inspectable sequence. This is run_3d7a1e on EX-3 · 2.5 mm² class 2 PVC building wire. Scenario completes in 10 steps with one approval gate. Wall settles at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93, no spark faults, reel R-30417 released with full genealogy.
Plant Orchestrator · Pulled the construction spec for 2.5 mm² class 2 PVC building wire from MES: 7 × 0.67 mm conductor, 0.80 mm nominal wall, 0.62 mm minimum spot wall, 6 kV spark test, 48 km order. Locked the target envelope.
Line Twin · Simulated 36 candidate recipes on the as-run line twin for draw schedule, lay length and extrusion setpoints, ranked on wall variance, concentricity, predicted spark risk and polymer give-away.
Draw-and-Anneal · Capstan tension on RB1 stepped down 6% as the die-wear estimate crossed its threshold. Diameter held at 0.670 mm ± 0.004 mm and the break-risk score fell from 0.31 to 0.09.
Draw-and-Anneal · Annealer current trimmed against the live conductivity reading to hold the softness target without over-anneal through the speed change.
Strand-and-Cable · Lay length set to 28 mm on bunching line ST2 with payoff tension balanced across 7 spools. Roundness index held above 0.97 into the extrusion payoff.
Insulate-and-Jacket · Screw speed and zone 3 temperature re-cut against melt pressure and material-lot moisture. Wall settled at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93.
Defect-and-Inspect · 6 cameras, the laser gauge, the eddy-current head and the spark tester fused at the edge. One neckdown precursor at 12,480 m flagged and cleared by a screw-speed trim before it reached the reel.
Plant Orchestrator · Line-speed ramp 1,100 to 1,250 m/min exceeded the site autonomy threshold. Held for the shift process engineer and approved at 06:41:52.
Robot-and-Handling · Reel change on take-up TU3 planned and executed by the handling robot. Payoff aligned and tension re-established inside the changeover window.
Quality-and-Conformance · Reel R-30417 released: genealogy written (conductor lot, draw and anneal record, lay, wall and concentricity trace, defect map, approvals) and checked against the construction spec.
A plant does not go from manual to unattended in one step. Draweon makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then graduated autonomy.
| Level | What the agent does | What the human does | Where it sits in a pilot |
|---|---|---|---|
| L1 · Advisory | Recommends setpoints and explains why, with citations | Enters every change manually | Shadow mode, weeks 1 to 3 |
| L2 · Supervised | Proposes a write; it executes on approval | Approves each write in the review console | Assist mode, weeks 4 to 8 |
| L3 · Bounded | Writes inside tag, rate and magnitude limits | Approves ramps, die changes and reel release | Graduated autonomy, from week 9 if the plant is satisfied |
| L4 · Unattended | Runs the envelope without prompting | Sets the envelope; reviews the shift record | Planned; after qualification on the construction |
Conductor moves at over a thousand metres a minute. Perception has to be local, deterministic and fast, so Draweon runs GPU inference at the plant edge and keeps training, simulation and optimisation in the cloud or on-prem.
4 to 12 cameras per line plus laser, eddy-current and spark streams fused at the line. Sub-50 ms alerting and sub-250 ms bounded control are the design targets. Jetson Thor is planned for higher sensor density.
Vision, time-series, anomaly and quality models behind one orchestrator at the plant edge, with canary rollout by line and fallback to the previous validated version.
Defect classifiers, sensor-fusion models, time-series prognostics and cable-process reasoning models trained on reel telemetry and engineer corrections. Dedicated training capacity is planned.
As-run drawing, stranding, extrusion, thermal and tension simulation. Physics-informed surrogates are planned so recipes can be optimised at production cadence.
Rare spark, pinhole, eccentricity, neckdown and break variants generated and validated against real gauge, spark and vision distributions before promotion. Planned.
Line sequencing, reel changeovers, energy allocation, takt and constrained setpoint proposals.
Spool, reel and payoff and take-up motion planned and validated in simulation before it runs next to moving conductor.
The questions plant directors and process engineers ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, and only at the autonomy level your plant has set. Level 1 is advisory: Draweon recommends and a human enters everything. Design partners start there, in shadow mode, before supervised writes.
Control returns to the line controller's last known-good state. Draweon is a supervisory layer on top of the PLCs and gauges you already run, never a replacement for them, so an outage degrades the line to its current way of running, not to a stop.
Advisory recommendations start from the physics-based twin and the construction spec in the first weeks. Defect prediction and break prediction improve as line history and labelled events accumulate per construction. The first training sets are sized at 5 to 20 million labelled frames and events, a design target.
Only if you choose cloud training. Recipes, process models and defect libraries are isolated per tenant and never used to train another customer's models. A fully on-prem deployment at the plant edge is available for sensitive producers.
You are, the same as with any control strategy, which is why every write is policy-checked, bounded, logged and reversible, and why anything above your risk threshold waits for a named approver. The audit log records the request, the reasoning, the limits applied and the human decision.
A paid pilot on one line, scoped to a single workflow with a baseline agreed in writing. Weeks 1 to 3 are connection and shadow-mode observation, weeks 4 to 8 are assist mode with engineer approval, and bounded autonomy follows if the plant is satisfied with the recommendations.
Start with one drawing, stranding or extrusion line and one measurable baseline. A paid pilot on wall and concentricity, break prediction or spark prediction shows the number before you commit further.
↑↓ navigate↵ openesc close