Partners

The channel is the machinery.

Draweon's distribution plan runs through the companies already on the plant floor: drawing, stranding, extrusion and inspection machinery OEMs, MES vendors and the integrators who connect them. The programme opens with the design-partner cohort; nothing here is a signed partnership.

OEMs · inspection · MESProgramme plannedNo signed partners claimed

run_3d7a1e · agent graph · EX-3 · scenario 10 nodes · 1 approval gate
01 · orchestrator ingest.order ✓ SUCCEEDED 02 · simweon twin.simulate ✓ SUCCEEDED 03 · draw_anneal draw.tension ✓ SUCCEEDED 04 · draw_anneal anneal.current ✓ SUCCEEDED 05 · strand_cable strand.lay ✓ SUCCEEDED 06 · insulate_jacket extrude.wall ✓ SUCCEEDED 07 · defect_inspect inspect.fuse ✓ SUCCEEDED 08 · orchestrator approve.human ◆ APPROVAL 09 · robot_handling reel.change ✓ SUCCEEDED 10 · quality_conf reel.release ✓ SUCCEEDED

Illustrative scenario: EX-3 · 2.5 mm² class 2 PVC building wire, changeover, no spark faults

Partner types

Who fits, and how

How each kind of partner fits the plan.

Machinery OEMs

Drawing, stranding, extrusion

Lines shipped Draweon-ready, with the controller tags and limits declared at the factory. The agent runs on the OEM line; the OEM keeps the machine relationship.

Inspection vendors

Laser, eddy-current, spark, vision

Gauge and tester data fused into Eddix. The vendor keeps the measurement; Draweon adds the prediction and the upstream correction.

MES vendors

Orders, genealogy, quality

Reel and length genealogy written back into the system of record. Evidence packets for customer and regulatory review.

Integrators

OT and plant networks

Connection, tag inventory and the shadow-mode weeks of a pilot, delivered by people the plant already trusts.

Cable makers

Design partners

The first three to five plants shape the roadmap and get written access terms. See the customers page.

Research and standards

UL, IEC, IPC, USCAR

Keeping the reasoning layer's citations current as standards change.

How it works

What a partner does and gets

The outline of the programme as planned.

A partner does

  • Declares the tags, limits and interfaces on the systems they ship or support
  • Co-delivers the shadow-mode and assist-mode weeks of a pilot
  • Brings a plant with a metric and a signed baseline

A partner gets

  • A Draweon-ready designation for the line, gauge or MES, once the connector is proven
  • A share of the Line and Plant subscription on plants they bring
  • Early access to the SDK and the twin for their own engineering
Integrations

It speaks line, not cloud

Draweon reads and writes through the systems already on the floor. No rip and replace, no parallel historian, no new HMI to learn. Vendor names are examples of systems found on cable lines; connector availability is confirmed per site.

Line control

PLC and SCADA on drawing, stranding and extrusion lines (Siemens, Rockwell and OEM controllers)

Setpoint reads and guarded writes

Diameter and eccentricity

Laser gauges and X-ray wall scanners (Sikora, Zumbach, Beta LaserMike and NDC class systems)

Wall, diameter, eccentricity traces

Eddy-current and spark

Eddy-current heads and spark testers

Fault events with length position

Cameras

Line-scan and area cameras on the line

Frames for lumps, neckdowns, surface faults

Drawing and annealing

Rod breakdown, intermediate and fine drawing, annealers (Niehoff and Properzi class lines)

Tension, die force, annealer current, conductivity

Stranding and cabling

Bunchers, planetary, rigid and tubular stranders (Gauder, Pourtier, Nextrom class lines)

Payoff tension, take-up, lay, geometry

Extrusion

Insulation and jacket lines (Maillefer, Rosendahl Nextrom, Troester, Davis-Standard class lines)

Screw, zones, melt pressure, cooling

MES and quality

Cable MES, quality systems and in-house records

Orders, constructions, reel genealogy

See all integrations

Run timeline · scenario

One scenario run, step by step

Every Draweon run is an ordered, inspectable sequence. This is run_3d7a1e on EX-3 · 2.5 mm² class 2 PVC building wire. Scenario completes in 10 steps with one approval gate. Wall settles at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93, no spark faults, reel R-30417 released with full genealogy.

run_3d7a1e EX-3 · 2.5 mm² class 2 PVC building wire illustrative scenario SUCCEEDED
  1. 01 ingest.order SUCCEEDED 0.6 s

    Plant Orchestrator · Pulled the construction spec for 2.5 mm² class 2 PVC building wire from MES: 7 × 0.67 mm conductor, 0.80 mm nominal wall, 0.62 mm minimum spot wall, 6 kV spark test, 48 km order. Locked the target envelope.

  2. 02 twin.simulate SUCCEEDED 41 s

    Line Twin · Simulated 36 candidate recipes on the as-run line twin for draw schedule, lay length and extrusion setpoints, ranked on wall variance, concentricity, predicted spark risk and polymer give-away.

  3. 03 draw.tension SUCCEEDED 1 m 48 s

    Draw-and-Anneal · Capstan tension on RB1 stepped down 6% as the die-wear estimate crossed its threshold. Diameter held at 0.670 mm ± 0.004 mm and the break-risk score fell from 0.31 to 0.09.

  4. 04 anneal.current SUCCEEDED 54 s

    Draw-and-Anneal · Annealer current trimmed against the live conductivity reading to hold the softness target without over-anneal through the speed change.

  5. 05 strand.lay SUCCEEDED 1 m 12 s

    Strand-and-Cable · Lay length set to 28 mm on bunching line ST2 with payoff tension balanced across 7 spools. Roundness index held above 0.97 into the extrusion payoff.

  6. 06 extrude.wall SUCCEEDED 2 m 36 s

    Insulate-and-Jacket · Screw speed and zone 3 temperature re-cut against melt pressure and material-lot moisture. Wall settled at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93.

  7. 07 inspect.fuse SUCCEEDED continuous

    Defect-and-Inspect · 6 cameras, the laser gauge, the eddy-current head and the spark tester fused at the edge. One neckdown precursor at 12,480 m flagged and cleared by a screw-speed trim before it reached the reel.

  8. 08 approve.human APPROVAL 38 s

    Plant Orchestrator · Line-speed ramp 1,100 to 1,250 m/min exceeded the site autonomy threshold. Held for the shift process engineer and approved at 06:41:52.

  9. 09 reel.change SUCCEEDED 2 m 05 s

    Robot-and-Handling · Reel change on take-up TU3 planned and executed by the handling robot. Payoff aligned and tension re-established inside the changeover window.

  10. 10 reel.release SUCCEEDED 1 m 10 s

    Quality-and-Conformance · Reel R-30417 released: genealogy written (conductor lot, draw and anneal record, lay, wall and concentricity trace, defect map, approvals) and checked against the construction spec.

Accelerated computing

Physical AI, at the die train

Conductor moves at over a thousand metres a minute. Perception has to be local, deterministic and fast, so Draweon runs GPU inference at the plant edge and keeps training, simulation and optimisation in the cloud or on-prem.

Jetson Orin · DeepStream · Holoscan · TensorRT

Edge perception

4 to 12 cameras per line plus laser, eddy-current and spark streams fused at the line. Sub-50 ms alerting and sub-250 ms bounded control are the design targets. Jetson Thor is planned for higher sensor density.

Triton · NIM

Model serving

Vision, time-series, anomaly and quality models behind one orchestrator at the plant edge, with canary rollout by line and fallback to the previous validated version.

DGX or HGX · NeMo

Training

Defect classifiers, sensor-fusion models, time-series prognostics and cable-process reasoning models trained on reel telemetry and engineer corrections. Dedicated training capacity is planned.

Omniverse · OVX · Modulus

Line twin

As-run drawing, stranding, extrusion, thermal and tension simulation. Physics-informed surrogates are planned so recipes can be optimised at production cadence.

Cosmos · Omniverse Replicator

Synthetic data

Rare spark, pinhole, eccentricity, neckdown and break variants generated and validated against real gauge, spark and vision distributions before promotion. Planned.

cuOpt

Optimisation

Line sequencing, reel changeovers, energy allocation, takt and constrained setpoint proposals.

Isaac · Isaac Sim

Robot handling

Spool, reel and payoff and take-up motion planned and validated in simulation before it runs next to moving conductor.

FAQ

Straight answers

The questions plant directors and process engineers ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, and only at the autonomy level your plant has set. Level 1 is advisory: Draweon recommends and a human enters everything. Design partners start there, in shadow mode, before supervised writes.

Get started

Talk about partnering

Tell us what you ship or support and which plants run it.