FAQ

Straight answers.

The questions plant directors, process engineers and quality engineers ask in the first meeting, answered as plainly as we can, including where the answer is planned rather than done.

12 questionsPre-launch answersUpdated 2026-10-08

run_3d7a1e · agent graph · EX-3 · scenario 10 nodes · 1 approval gate
01 · orchestrator ingest.order ✓ SUCCEEDED 02 · simweon twin.simulate ✓ SUCCEEDED 03 · draw_anneal draw.tension ✓ SUCCEEDED 04 · draw_anneal anneal.current ✓ SUCCEEDED 05 · strand_cable strand.lay ✓ SUCCEEDED 06 · insulate_jacket extrude.wall ✓ SUCCEEDED 07 · defect_inspect inspect.fuse ✓ SUCCEEDED 08 · orchestrator approve.human ◆ APPROVAL 09 · robot_handling reel.change ✓ SUCCEEDED 10 · quality_conf reel.release ✓ SUCCEEDED

Illustrative scenario: EX-3 · 2.5 mm² class 2 PVC building wire, changeover, no spark faults

FAQ

Everything we get asked

Twelve questions. If yours is not here, ask it.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, and only at the autonomy level your plant has set. Level 1 is advisory: Draweon recommends and a human enters everything. Design partners start there, in shadow mode, before supervised writes.

Run timeline · scenario

One scenario run, step by step

Every Draweon run is an ordered, inspectable sequence. This is run_3d7a1e on EX-3 · 2.5 mm² class 2 PVC building wire. Scenario completes in 10 steps with one approval gate. Wall settles at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93, no spark faults, reel R-30417 released with full genealogy.

run_3d7a1e EX-3 · 2.5 mm² class 2 PVC building wire illustrative scenario SUCCEEDED
  1. 01 ingest.order SUCCEEDED 0.6 s

    Plant Orchestrator · Pulled the construction spec for 2.5 mm² class 2 PVC building wire from MES: 7 × 0.67 mm conductor, 0.80 mm nominal wall, 0.62 mm minimum spot wall, 6 kV spark test, 48 km order. Locked the target envelope.

  2. 02 twin.simulate SUCCEEDED 41 s

    Line Twin · Simulated 36 candidate recipes on the as-run line twin for draw schedule, lay length and extrusion setpoints, ranked on wall variance, concentricity, predicted spark risk and polymer give-away.

  3. 03 draw.tension SUCCEEDED 1 m 48 s

    Draw-and-Anneal · Capstan tension on RB1 stepped down 6% as the die-wear estimate crossed its threshold. Diameter held at 0.670 mm ± 0.004 mm and the break-risk score fell from 0.31 to 0.09.

  4. 04 anneal.current SUCCEEDED 54 s

    Draw-and-Anneal · Annealer current trimmed against the live conductivity reading to hold the softness target without over-anneal through the speed change.

  5. 05 strand.lay SUCCEEDED 1 m 12 s

    Strand-and-Cable · Lay length set to 28 mm on bunching line ST2 with payoff tension balanced across 7 spools. Roundness index held above 0.97 into the extrusion payoff.

  6. 06 extrude.wall SUCCEEDED 2 m 36 s

    Insulate-and-Jacket · Screw speed and zone 3 temperature re-cut against melt pressure and material-lot moisture. Wall settled at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93.

  7. 07 inspect.fuse SUCCEEDED continuous

    Defect-and-Inspect · 6 cameras, the laser gauge, the eddy-current head and the spark tester fused at the edge. One neckdown precursor at 12,480 m flagged and cleared by a screw-speed trim before it reached the reel.

  8. 08 approve.human APPROVAL 38 s

    Plant Orchestrator · Line-speed ramp 1,100 to 1,250 m/min exceeded the site autonomy threshold. Held for the shift process engineer and approved at 06:41:52.

  9. 09 reel.change SUCCEEDED 2 m 05 s

    Robot-and-Handling · Reel change on take-up TU3 planned and executed by the handling robot. Payoff aligned and tension re-established inside the changeover window.

  10. 10 reel.release SUCCEEDED 1 m 10 s

    Quality-and-Conformance · Reel R-30417 released: genealogy written (conductor lot, draw and anneal record, lay, wall and concentricity trace, defect map, approvals) and checked against the construction spec.

Autonomy

Four levels, set per agent and per tag

A plant does not go from manual to unattended in one step. Draweon makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then graduated autonomy.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · AdvisoryRecommends setpoints and explains why, with citationsEnters every change manuallyShadow mode, weeks 1 to 3
L2 · SupervisedProposes a write; it executes on approvalApproves each write in the review consoleAssist mode, weeks 4 to 8
L3 · BoundedWrites inside tag, rate and magnitude limitsApproves ramps, die changes and reel releaseGraduated autonomy, from week 9 if the plant is satisfied
L4 · UnattendedRuns the envelope without promptingSets the envelope; reviews the shift recordPlanned; after qualification on the construction
Guardrails

An agent that can move a screw speed needs a leash

Draweon writes to production equipment. Every capability is scoped, every write is policy-checked, and every action is written to an append-only audit log the plant owns.

  • Bounded action space. Each agent writes only to an explicit tag allow-list, inside per-tag rate and magnitude limits.
  • Policy engine before every write. Autonomy level, shift, construction, interlock state and operator presence are evaluated before a setpoint moves.
  • Human-in-the-loop gates. Anything above the site threshold, such as line-speed ramps, die changes and reel release, waits for a named approver.
  • Immutable audit log. Append-only and exportable. Every action records source signals, retrieved procedures, predicted impact, allowed range, rollback condition, approver and reel scope.
  • Hard fallback. Loss of the edge node, the network or a model returns control to the line controller's last known-good state.
  • Tenant and IP isolation. Construction recipes, defect libraries and process memory never cross a customer boundary. On-prem deployment is available for sensitive producers.

Compliance posture

Compliance and certification status
ItemScopeStatus
SOC 2 Type ICloud control plane QUEUED Planned, first 6 months
SOC 2 Type IICloud control plane QUEUED Planned, 6 to 12 months
SSO and RBACConsole and approvals QUEUED Planned, 6 to 12 months
Standards-cited reasoningUL, IEC, IPC, USCAR documents RUNNING In the design, every answer cites its source
Per-tenant isolationRecipes, models, memory RUNNING In the design from day one
On-prem and plant-edge deploymentSensitive producers RUNNING Design option

Read the security overview

Pricing

Priced per line, per plant, per group

Land on one workflow with a measured baseline. Expand by line, module and autonomy level. Outcome components are available on yield, scrap, length and energy. Annual prepay carries a 15 to 20% discount.

Billing period
Line $14,000 per drawing, stranding or extrusion line / month · billed monthly

Drawing or extrusion control, or inspection, for a single line. For cable makers validating ROI on the wedge.

  • One line, one agent module
  • Plant-edge inference node included
  • Line controller and gauge reads, guarded writes
  • Run log, audit trail, reel genealogy
  • Business-hours support
Start a pilot
Enterprise Custom land $650k to $8.5M ACV

Multi-site wire and cable groups standardising on Draweon, with custom conductor, insulation and tolerance models.

  • Multi-site fleet management
  • Custom conductor, insulation and tolerance models
  • Plant edge fleet with on-prem option
  • Group autonomy policy and approval chains
  • SLAs, SSO and RBAC, dedicated engineer
Contact us
Get started

Ask the question we missed

Start with one drawing, stranding or extrusion line and one measurable baseline. A paid pilot on wall and concentricity, break prediction or spark prediction shows the number before you commit further.