Enterprise

One policy. Every line. Every plant.

Multi-site wire and cable groups standardise on Draweon for the governance as much as the control: one autonomy policy with per-site override, one audit trail, fleet-managed plant-edge nodes, and conductor, insulation and tolerance models that stay private to each plant.

Land $650k to $8.5M ACVFleet-managed plant edgePer-site private models

run_3d7a1e · agent graph · EX-3 · scenario 10 nodes · 1 approval gate
01 · orchestrator ingest.order ✓ SUCCEEDED 02 · simweon twin.simulate ✓ SUCCEEDED 03 · draw_anneal draw.tension ✓ SUCCEEDED 04 · draw_anneal anneal.current ✓ SUCCEEDED 05 · strand_cable strand.lay ✓ SUCCEEDED 06 · insulate_jacket extrude.wall ✓ SUCCEEDED 07 · defect_inspect inspect.fuse ✓ SUCCEEDED 08 · orchestrator approve.human ◆ APPROVAL 09 · robot_handling reel.change ✓ SUCCEEDED 10 · quality_conf reel.release ✓ SUCCEEDED

Illustrative scenario: EX-3 · 2.5 mm² class 2 PVC building wire, changeover, no spark faults

Enterprise features

What the Enterprise tier adds

Items marked planned follow the 6 to 12 month roadmap.

Governance

Group autonomy policy

One policy model for the group with per-site override and approval chains. Tag allow-lists and limits reviewed and versioned like code.

Identity

SSO, SCIM and tag-level RBAC

Named approvers, role-based access down to the tag. Planned for the 6 to 12 month release.

Fleet

Plant-edge fleet management

Model versions promoted by line with canary rollout and automatic fallback across every plant. On-prem and air-gapped options.

Models

Custom conductor, insulation and tolerance models

Per-site process models built on the plant's own constructions and kept private to that tenant.

Benchmarking

Cross-plant benchmarks

Scrap, give-away, breaks, energy and first-pass quality compared across plants without moving recipes across tenant boundaries. Data-network tiers are planned.

Support

Dedicated engineer, SLAs

A dedicated deployment engineer, quarterly model review per plant and SLA terms set per agreement.

Deployment

Where it runs

The plant edge is always local. The control plane can be cloud, on-prem or absent.

Deployment options
OptionPlant edgeControl planeFor
Cloud control planeJetson nodes at the lineDraweon cloud, per-tenant isolationMost plants; cloud training optional
On-prem control planeJetson nodes at the lineIn the plant's data centreSensitive producers, strict IP controls
Air-gappedJetson nodes at the lineIn the plant, no external linkDefence and specialty constructions
Edge-only degradationReturns to controller last known-goodUnreachableWhat happens on any control-plane loss
Enterprise

Standardise autonomy across the group

One policy model, one audit trail, one benchmark across every line in every plant, with the conductor, insulation and tolerance models kept private to each site.

Talk to us Enterprise details

  • SSO and role-based access down to the tag level, planned for the 6 to 12 month release
  • Group-wide autonomy policy with per-site override and approval chains
  • Cross-plant benchmarking on scrap, give-away, breaks, energy and first-pass quality
  • On-prem and plant-edge deployment, with air-gapped operation for sensitive producers
  • Edge autonomy that survives control-plane loss by returning to the controller's last known-good state
  • Dedicated deployment engineer and quarterly model review per plant
Run timeline · scenario

One scenario run, step by step

Every Draweon run is an ordered, inspectable sequence. This is run_3d7a1e on EX-3 · 2.5 mm² class 2 PVC building wire. Scenario completes in 10 steps with one approval gate. Wall settles at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93, no spark faults, reel R-30417 released with full genealogy.

run_3d7a1e EX-3 · 2.5 mm² class 2 PVC building wire illustrative scenario SUCCEEDED
  1. 01 ingest.order SUCCEEDED 0.6 s

    Plant Orchestrator · Pulled the construction spec for 2.5 mm² class 2 PVC building wire from MES: 7 × 0.67 mm conductor, 0.80 mm nominal wall, 0.62 mm minimum spot wall, 6 kV spark test, 48 km order. Locked the target envelope.

  2. 02 twin.simulate SUCCEEDED 41 s

    Line Twin · Simulated 36 candidate recipes on the as-run line twin for draw schedule, lay length and extrusion setpoints, ranked on wall variance, concentricity, predicted spark risk and polymer give-away.

  3. 03 draw.tension SUCCEEDED 1 m 48 s

    Draw-and-Anneal · Capstan tension on RB1 stepped down 6% as the die-wear estimate crossed its threshold. Diameter held at 0.670 mm ± 0.004 mm and the break-risk score fell from 0.31 to 0.09.

  4. 04 anneal.current SUCCEEDED 54 s

    Draw-and-Anneal · Annealer current trimmed against the live conductivity reading to hold the softness target without over-anneal through the speed change.

  5. 05 strand.lay SUCCEEDED 1 m 12 s

    Strand-and-Cable · Lay length set to 28 mm on bunching line ST2 with payoff tension balanced across 7 spools. Roundness index held above 0.97 into the extrusion payoff.

  6. 06 extrude.wall SUCCEEDED 2 m 36 s

    Insulate-and-Jacket · Screw speed and zone 3 temperature re-cut against melt pressure and material-lot moisture. Wall settled at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93.

  7. 07 inspect.fuse SUCCEEDED continuous

    Defect-and-Inspect · 6 cameras, the laser gauge, the eddy-current head and the spark tester fused at the edge. One neckdown precursor at 12,480 m flagged and cleared by a screw-speed trim before it reached the reel.

  8. 08 approve.human APPROVAL 38 s

    Plant Orchestrator · Line-speed ramp 1,100 to 1,250 m/min exceeded the site autonomy threshold. Held for the shift process engineer and approved at 06:41:52.

  9. 09 reel.change SUCCEEDED 2 m 05 s

    Robot-and-Handling · Reel change on take-up TU3 planned and executed by the handling robot. Payoff aligned and tension re-established inside the changeover window.

  10. 10 reel.release SUCCEEDED 1 m 10 s

    Quality-and-Conformance · Reel R-30417 released: genealogy written (conductor lot, draw and anneal record, lay, wall and concentricity trace, defect map, approvals) and checked against the construction spec.

Guardrails

An agent that can move a screw speed needs a leash

Draweon writes to production equipment. Every capability is scoped, every write is policy-checked, and every action is written to an append-only audit log the plant owns.

  • Bounded action space. Each agent writes only to an explicit tag allow-list, inside per-tag rate and magnitude limits.
  • Policy engine before every write. Autonomy level, shift, construction, interlock state and operator presence are evaluated before a setpoint moves.
  • Human-in-the-loop gates. Anything above the site threshold, such as line-speed ramps, die changes and reel release, waits for a named approver.
  • Immutable audit log. Append-only and exportable. Every action records source signals, retrieved procedures, predicted impact, allowed range, rollback condition, approver and reel scope.
  • Hard fallback. Loss of the edge node, the network or a model returns control to the line controller's last known-good state.
  • Tenant and IP isolation. Construction recipes, defect libraries and process memory never cross a customer boundary. On-prem deployment is available for sensitive producers.

Compliance posture

Compliance and certification status
ItemScopeStatus
SOC 2 Type ICloud control plane QUEUED Planned, first 6 months
SOC 2 Type IICloud control plane QUEUED Planned, 6 to 12 months
SSO and RBACConsole and approvals QUEUED Planned, 6 to 12 months
Standards-cited reasoningUL, IEC, IPC, USCAR documents RUNNING In the design, every answer cites its source
Per-tenant isolationRecipes, models, memory RUNNING In the design from day one
On-prem and plant-edge deploymentSensitive producers RUNNING Design option

Read the security overview

Autonomy

Four levels, set per agent and per tag

A plant does not go from manual to unattended in one step. Draweon makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then graduated autonomy.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · AdvisoryRecommends setpoints and explains why, with citationsEnters every change manuallyShadow mode, weeks 1 to 3
L2 · SupervisedProposes a write; it executes on approvalApproves each write in the review consoleAssist mode, weeks 4 to 8
L3 · BoundedWrites inside tag, rate and magnitude limitsApproves ramps, die changes and reel releaseGraduated autonomy, from week 9 if the plant is satisfied
L4 · UnattendedRuns the envelope without promptingSets the envelope; reviews the shift recordPlanned; after qualification on the construction
Integrations

It speaks line, not cloud

Draweon reads and writes through the systems already on the floor. No rip and replace, no parallel historian, no new HMI to learn. Vendor names are examples of systems found on cable lines; connector availability is confirmed per site.

Line control

PLC and SCADA on drawing, stranding and extrusion lines (Siemens, Rockwell and OEM controllers)

Setpoint reads and guarded writes

Diameter and eccentricity

Laser gauges and X-ray wall scanners (Sikora, Zumbach, Beta LaserMike and NDC class systems)

Wall, diameter, eccentricity traces

Eddy-current and spark

Eddy-current heads and spark testers

Fault events with length position

Cameras

Line-scan and area cameras on the line

Frames for lumps, neckdowns, surface faults

Drawing and annealing

Rod breakdown, intermediate and fine drawing, annealers (Niehoff and Properzi class lines)

Tension, die force, annealer current, conductivity

Stranding and cabling

Bunchers, planetary, rigid and tubular stranders (Gauder, Pourtier, Nextrom class lines)

Payoff tension, take-up, lay, geometry

Extrusion

Insulation and jacket lines (Maillefer, Rosendahl Nextrom, Troester, Davis-Standard class lines)

Screw, zones, melt pressure, cooling

MES and quality

Cable MES, quality systems and in-house records

Orders, constructions, reel genealogy

See all integrations

FAQ

Straight answers

The questions plant directors and process engineers ask in the first meeting.

Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, and only at the autonomy level your plant has set. Level 1 is advisory: Draweon recommends and a human enters everything. Design partners start there, in shadow mode, before supervised writes.

Get started

Standardise the group

Start with one drawing, stranding or extrusion line and one measurable baseline. A paid pilot on wall and concentricity, break prediction or spark prediction shows the number before you commit further.