Run a wedge on one line
Wall and concentricity, break prediction or spark prediction, with a metric you already measure.
Draweon starts with a paid pilot on one drawing, stranding or extrusion line and a baseline agreed in writing. Tell us the line, the metric and the systems on it. We will say plainly whether the wedge fits and what the first ninety days would look like.
Wall and concentricity, break prediction or spark prediction, with a metric you already measure.
Machinery OEMs, inspection and MES vendors, integrators.
We answer plainly, including what is planned rather than done.
Edge perception, OT integration, simulation, process engineering.
On wire drawing, extrusion, inspection and autonomy on the line.
Pre-revenue, pre-institutional. We do not claim traction we do not have.
The first-release plan, applied to your line.
Every Draweon run is an ordered, inspectable sequence. This is run_3d7a1e on EX-3 · 2.5 mm² class 2 PVC building wire. Scenario completes in 10 steps with one approval gate. Wall settles at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93, no spark faults, reel R-30417 released with full genealogy.
Plant Orchestrator · Pulled the construction spec for 2.5 mm² class 2 PVC building wire from MES: 7 × 0.67 mm conductor, 0.80 mm nominal wall, 0.62 mm minimum spot wall, 6 kV spark test, 48 km order. Locked the target envelope.
Line Twin · Simulated 36 candidate recipes on the as-run line twin for draw schedule, lay length and extrusion setpoints, ranked on wall variance, concentricity, predicted spark risk and polymer give-away.
Draw-and-Anneal · Capstan tension on RB1 stepped down 6% as the die-wear estimate crossed its threshold. Diameter held at 0.670 mm ± 0.004 mm and the break-risk score fell from 0.31 to 0.09.
Draw-and-Anneal · Annealer current trimmed against the live conductivity reading to hold the softness target without over-anneal through the speed change.
Strand-and-Cable · Lay length set to 28 mm on bunching line ST2 with payoff tension balanced across 7 spools. Roundness index held above 0.97 into the extrusion payoff.
Insulate-and-Jacket · Screw speed and zone 3 temperature re-cut against melt pressure and material-lot moisture. Wall settled at 0.80 mm nominal, minimum 0.66 mm, concentricity 0.93.
Defect-and-Inspect · 6 cameras, the laser gauge, the eddy-current head and the spark tester fused at the edge. One neckdown precursor at 12,480 m flagged and cleared by a screw-speed trim before it reached the reel.
Plant Orchestrator · Line-speed ramp 1,100 to 1,250 m/min exceeded the site autonomy threshold. Held for the shift process engineer and approved at 06:41:52.
Robot-and-Handling · Reel change on take-up TU3 planned and executed by the handling robot. Payoff aligned and tension re-established inside the changeover window.
Quality-and-Conformance · Reel R-30417 released: genealogy written (conductor lot, draw and anneal record, lay, wall and concentricity trace, defect map, approvals) and checked against the construction spec.
Land on one workflow with a measured baseline. Expand by line, module and autonomy level. Outcome components are available on yield, scrap, length and energy. Annual prepay carries a 15 to 20% discount.
Drawing or extrusion control, or inspection, for a single line. For cable makers validating ROI on the wedge.
The whole loop: draw and anneal, strand and cable, insulate and jacket, defect, quality and dimension, yield and takt, robotic handling and the twin.
Multi-site wire and cable groups standardising on Draweon, with custom conductor, insulation and tolerance models.
Draweon writes to production equipment. Every capability is scoped, every write is policy-checked, and every action is written to an append-only audit log the plant owns.
| Item | Scope | Status |
|---|---|---|
| SOC 2 Type I | Cloud control plane | QUEUED Planned, first 6 months |
| SOC 2 Type II | Cloud control plane | QUEUED Planned, 6 to 12 months |
| SSO and RBAC | Console and approvals | QUEUED Planned, 6 to 12 months |
| Standards-cited reasoning | UL, IEC, IPC, USCAR documents | RUNNING In the design, every answer cites its source |
| Per-tenant isolation | Recipes, models, memory | RUNNING In the design from day one |
| On-prem and plant-edge deployment | Sensitive producers | RUNNING Design option |
Draweon reads and writes through the systems already on the floor. No rip and replace, no parallel historian, no new HMI to learn. Vendor names are examples of systems found on cable lines; connector availability is confirmed per site.
PLC and SCADA on drawing, stranding and extrusion lines (Siemens, Rockwell and OEM controllers)
Setpoint reads and guarded writes
Laser gauges and X-ray wall scanners (Sikora, Zumbach, Beta LaserMike and NDC class systems)
Wall, diameter, eccentricity traces
Eddy-current heads and spark testers
Fault events with length position
Line-scan and area cameras on the line
Frames for lumps, neckdowns, surface faults
Rod breakdown, intermediate and fine drawing, annealers (Niehoff and Properzi class lines)
Tension, die force, annealer current, conductivity
Bunchers, planetary, rigid and tubular stranders (Gauder, Pourtier, Nextrom class lines)
Payoff tension, take-up, lay, geometry
Insulation and jacket lines (Maillefer, Rosendahl Nextrom, Troester, Davis-Standard class lines)
Screw, zones, melt pressure, cooling
Cable MES, quality systems and in-house records
Orders, constructions, reel genealogy
The questions plant directors and process engineers ask in the first meeting.
Yes, but only within an explicit tag allow-list with per-tag rate and magnitude limits, and only at the autonomy level your plant has set. Level 1 is advisory: Draweon recommends and a human enters everything. Design partners start there, in shadow mode, before supervised writes.
Control returns to the line controller's last known-good state. Draweon is a supervisory layer on top of the PLCs and gauges you already run, never a replacement for them, so an outage degrades the line to its current way of running, not to a stop.
Advisory recommendations start from the physics-based twin and the construction spec in the first weeks. Defect prediction and break prediction improve as line history and labelled events accumulate per construction. The first training sets are sized at 5 to 20 million labelled frames and events, a design target.
Only if you choose cloud training. Recipes, process models and defect libraries are isolated per tenant and never used to train another customer's models. A fully on-prem deployment at the plant edge is available for sensitive producers.
You are, the same as with any control strategy, which is why every write is policy-checked, bounded, logged and reversible, and why anything above your risk threshold waits for a named approver. The audit log records the request, the reasoning, the limits applied and the human decision.
A paid pilot on one line, scoped to a single workflow with a baseline agreed in writing. Weeks 1 to 3 are connection and shadow-mode observation, weeks 4 to 8 are assist mode with engineer approval, and bounded autonomy follows if the plant is satisfied with the recommendations.
Breaks per shift, give-away, spark faults, energy per reel. We will tell you which wedge fits.
↑↓ navigate↵ openesc close